ERP for manufacturing, from customer order to delivery
For companies that make to order or in small batches. The customer order becomes a work order with bill of materials and routing. Materials, inspections, delivery and invoice hang off the same order. The AI Steward reports bottlenecks before the machine waits.

Where manufacturing loses time
Material missing at the start
Whether everything is there only shows at the machine. Then the order waits.
Bills of materials in Excel
Every change has to be entered in several lists. One of them is always out of date.
No overview of the status
Which order is running, which is waiting? The answer is on the whiteboard.
Complaints on paper
Nonconformities and actions sit in emails and folders. At the audit people search.
How a work order runs in relyd
The screenshots are taken from relyd, filled with sample data of a precision parts maker.
Work orders with progress and work center
Every work order comes with bill of materials, work center and planned dates. The list shows produced quantity, priority and status, as a list or kanban.
- Bills of materials and routings with approval
- Work centers, machines and capacity
- Feedback at the shop floor terminal
- Scrap, rework and costing per order

Quality in the same system
Inspections, nonconformities and actions belong to the order, the item and the supplier. Nonconformities follow the 8D steps.
- Internal nonconformities, supplier and customer complaints
- Actions with owner and due date
- Gauges, sampling plans and first articles
- Effectiveness check after closing

The day starts with the bottlenecks
The start page “Today” shows what the AI Steward handled, what waits for your approval and where material is missing or orders are late.
- Missing material requested
- Suppliers reminded of dates
- Customers informed about delays
- Purchase suggestions wait for approval
What the AI Steward takes over in manufacturing
Every workflow starts manually or with your approval and only runs on its own once it has proven itself. Every step is logged.
Work order waiting for material
Proposes a task to request or transfer material for work orders waiting for it for more than a day.
Work order late
Proposes a task with the progress and the question of a new end date for work orders past their planned end.
Work order not started
Proposes a task to check the bottleneck when released work orders have not started 2 days after their planned start.
Bill of materials waiting
Proposes a task for the approver of submitted bills of materials and points out implausible costs or times.
Inspection failed
Proposes a task for quality to open a nonconformity and decide on blocking the batch when an inspection was rejected.
Nonconformity without action
Sends the owner of nonconformities open for 7 days without actions an 8D-style outline of the next steps.
Modules for manufacturing
Frequently asked questions
- Are existing bills of materials taken over?
- Yes. Items, bills of materials and stock from Excel or your current system are part of the setup.
- Which companies is this for?
- For companies that make to order or in small batches and want warehouse, purchasing and invoicing in the same system.
- Is there feedback from the shop floor?
- Yes. At the terminal employees report start, quantity, scrap and stop of an operation.
- How is quality managed?
- With inspections, 8D nonconformities, actions, gauges, sampling plans and first articles in the Quality module.
- Where is the data stored?
- The data is stored in European data centres.
Test relyd with your own bills of materials